Road Works – Mahmoudia Hammam Canal
Moonlight successfully executed road development along the Mahmoudia Hammam Canal in Alexandria (2022-2023), in collaboration with The Engineering Authority of the Armed Forces. This project enhanced connectivity and transportation efficiency, adhering to the highest engineering standards.
Discover More
Um Zaghio Road Development
Moonlight executed the backfilling, construction, and paving of the 5 km Um Zaghio Road in Alexandria (2023-2024), in collaboration with The Engineering Authority of the Armed Forces. This project enhanced regional infrastructure, ensuring durability and optimal transportation efficiency.
Discover More
Highway Construction – Sirte to Ras Lanuf
Moonlight is developing 25 km of highways along the International Coastal Road in Libya (2024-2025), in collaboration with The Ark (The National Development Authority). This project enhances connectivity and supports regional development with high-quality infrastructure.
Discover More
Cairo–Alexandria Service Road Development
Moonlight carried out 25 km of road works to develop the Cairo–Alexandria service road (2019–2020), in collaboration with The Engineering Authority of the Armed Forces. The project aimed to enhance road capacity, safety, and service efficiency along this vital corridor.
Discover More

Who we are

Moon Light For General Contracting

An Egyptian contracting company established in 1997, Moonlight is one of the leading companies in implementing roads and bridges development, building works, water and sewage stations and networks, public works, irrigation stations, electromechanical works for facilities, factories, public buildings, and light current networks.

What we do

Years of Experience
8 +

A

Grade A Contractor In Egypt & Libya

KM Roads & Bridges
1500 +

Moon Light works to empower various sectors and is a leading contractor in the field of roads, bridges, various constructions, electromechanical works, tunnels, and the construction of water and sewage plants.

  • 100+ Engineering Personnel
  • 200+ Heavy Equipment
  • 600+ Manpower
  • Infrastructure
  • Water Control & Earthworks
  • Railways
  • Bridges
  • Buildings
  • Roads

Discover our partners

Discover Our Clients

Our projects locations

Construction of the ring road and internal roads of the residential city at the Japanese University in Borg El Arab

Excavation, backfilling and taxis at Bahr Al-Baqar Bank

Road works for the development of the service road for Cairo / Alexandria road with a length of 25 km

Backfilling, construction and paving of a road (Mohamed Nasr axis) in El Shorouk City with a length of 5 km

Road works for the development and upgrading of roads and entrances to the city of Matrouh (Al-Gharam Beach with a length of 5 km)

Road works pending the implementation of works (rock settlement - waste removal) for the first precedence located within the New Administrative Capital (first sector)

Road works to develop and raise the efficiency of roads and entrances to Matrouh city

Road works pending the construction of 47 residential buildings south of El Shorouk City with a length of 5 km

Road works pending the development of the four entrances to the New Administrative Capital from the Regional Ring Road and from the Middle Ring Road Plasma Factory Road

Excavation and construction of rubble stone cover for the agricultural sector with a length of 10 km

Al Lowa' Arkan Harb Gamal Mohamed Ali Bridge, Ash Sheikh Zayed, Giza, Egypt

Road works for the construction and paving of the intersection of the Dabaa axis with the Burqan link

Excavation and backfilling works for the development of coastal land west of New City of Alamein Road (26)

Asphalt works for the implementation of all components of Misr International City for Olympic Games North direction

Excavation and backfilling works Ravel Project (Fifth Settlement)

Road works pending the implementation of the general site works around the appraisers in the strategic command of the third sector

Road works pending the construction of the entrances to each of (Egypt International City for the Olympic Games - Marabat Misr - Ain Shams University - Complex of Secure and Smart Documents)

Ain Shams University, 6th October Bridge, Al Demerdash, El-Demerdash, Cairo, 11657, Egypt alsaden stud, Omar Abu Salib Street, Giza, 12841, Egypt

Road works pending the implementation of the northern entrance project for Zahraa Maadi area

Excavation, replacement and testing works in the yards of the container terminal in Damietta

Land Settlement and Reclamation Works in Toshka

Road works for the development of the main road of the Cairo / Alexandria road with a length of 25 km

Backfilling, construction and paving works on the Maria axis, the second phase

Backfilling, construction and paving works along axis (C) with a length of 4 km

Expansion and paving of service road (Cairo - Sokhna)

Backfilling and construction works (Hammam Canal) water sector

highway works pending the implementation of the expansion works of the Middle Ring Road (Cairo / Sokhna)

Road works for the development of Midar Road (formerly Al-Rubiki Road) east of Mostakbal City with a length of (7) km

Backfilling the transition zone around the shoulders of the Regua Bridge

Construction and paving of Ismailia / Suez (almueahada) road (Abu Balah - Nefesha) with a length of 15 km

Earthen bridge works in the sector of the construction of the electric express train (Luxor)

Earthen bridge works in the sectors of the high-speed electric train construction project (Regua)

highway works for the implementation of Cairo / Suez Road Development Works

highway works pending the implementation of the Dabaa axis

highway works for the expansion of the coastal road from the city of Dabaa to Marsa Matrouh

Construction and paving works on the international coastal highway , the second phase, with a length of 11 km

Backfilling, construction and paving works on the Maria axis, the first phase

Construction and paving of New Alamein Airport Road with a length of 5 km

Backfilling, construction and paving works along the axis (D) with a length of 4 km

Backfilling, construction and paving works along the Abu Zekri axis with a length of 10 km

The work of supplying clean natural sand on the walkway of the people of Alexandria

Road works to link the strategic command with the surrounding roads, including a ring road outside the leadership fence

Excavation and backfilling works for the development of road axes in Heliopolis (recruitment / Shubra Banha

Excavation works for the implementation of the project of digging a canal branch (4) for the Toshka area

Road works to implement the development of the coastal road Alexandria / Matrouh with a length of 55 km in the sector from the intersection of Wadi El-Natroun / El Alamein road until the entrance to El Alamein Airport

Wadi El Natroun Monestaries Road, The Lake, Egypt

Construction and paving of internal roads in (Al-Khamayeel) 6th of October City

Road works pending the implementation of road expansion works (Inshas / Belbeis)

highway works pending the implementation of the expansion works of the Middle Ring Road (Cairo / Belbeis)

highway works pending the implementation of the expansion works of the Middle Ring Road in the distance from the intersection with the Cairo / Suez Road to the intersection with the Cairo / Ain Sokhna road

Road works pending the development of road axes in Heliopolis

highway works pending the implementation of the um Qamar axis extension project

Paving the roads surrounding the Japanese University in Burj Al Arab

Road works to develop and raise the efficiency of the emergency axis

highway works pending the implementation of the roads of the new Alamein city

highway works pending the development of Cairo-Ismailia-Desert Road, the third phase, with a length of 10 km

highway works pending the development of roads in Sharm El Sheikh

Construction and paving of Ismailia / Suez (almueahada) Road (Abu Balah) with a length of 15 km

Development and upgrading of Ismailia / Suez highway with a length of 15 km

Earthen bridge works in the sector of the construction of the electric express train (Sadat)

Earthen bridge works in the sector of the construction of the electric high-speed train project (October)

Earthen bridge works in the sector of the construction of the electric high-speed train (Sokhna)

Excavation, backfilling and foundation layers for the new city of El Alamein city

Construction and paving works on the international coastal road, the first phase, with a length of 7 km

Alexandria, Marsa Matrouh Road, Al Agamy, Al Dikheila, Alexandria, 21575, Egypt

Road works in Toshka, east of Owainat, with a length of 25 km

Road works in the roads of Lake Manzala

Road works on the path of Al-Billaha / Dakhla road east of Owainat

Paving works on the path of Al-Wahat / Dakhla road east of Owainat

Road works along Abu Qir Port Road with a length of 10 km, first phase

Backfilling and construction works for the old Mostorod Road (from Arbaeen Square to the Artisan Bridge with a length of 3.5 km)

settlement works and concrete slabs at the intersection of Cairo - Suez Road - Gardenia Bridge

Excavation works pending the reclamation of new lands in the areas south of the Dabaa axis (Hammam Canal / water sector) with a length of 5 km

Road works in Adly Mansour axis

Backfilling works and construction of a bridge at the intersection of Mohamed Naguib with Ain Sokhna Road

Road works for the project of the satellite operation regiment in Hikestep

Road works at Hikestep Military Base

Excavation, backfilling and construction of the security zone facilities (Port Said)

Backfilling and construction works for the middle ring road

Backfilling and construction works for the Jabal Obeid project

Road works pending the development of the Cairo-Suez - Garden Bridge intersection area

Road works pending the implementation of a project (Cairo / Suez Road Development Works in the distance from its intersection with the Regional Ring Road until the tunnel link)

Road works pending the implementation of a project (Development works on Fayoum Road / from the Middle Ring Road to Al-Ramaya Square)

Backfilling, construction and paving of (Muhammad Ali - um Kulthum) road in Ismailia city

Backfilling, construction and paving works of Ismailia Corniche

Development of the roads of the Third Settlement south of the investors area in New Cairo (linking the Mohamed Naguib axis to the express train station) Obour Road from and Ramb (Obour - Katameya)

Road works for the acquisition of new lands in the areas south of the Dabaa axis (Al-Hamam Canal) from the mark

Road works on the Ras Al-Naqab (Nakhl) tunnel road with a length of 25 km

Road works for the development of road axes in Heliopolis (Phase II)

Road works pending the development of Nasr City roads, fourth phase

Road works for the development of Nasr City roads, third phase (Mostafa El-Nahhas Street)

Road works for the development of Nasr City Roads Phase II (Charter Street)

Road works pending the development of Nasr City roads, the first stage (loyalty and hope)

Road works in the industrial zone in East Port Said

highway works at the intersection of the 3rd of July Corridor with 30th of July

Road works for the development and expansion of Geneva Road (Rubiki Sector) with a length of 5 km

Road works for the development and expansion of Geneva Road (Suez Sector) with a length of 16 km

highway works Implementation of coastal development works / Alexandria / Matrouh

Road works to raise the efficiency and development of new roads and intersections in the area of the National Museum of Civilization and Ain Al-Sira

Covering works of rubble stone for the road (Oyoun Moussa - Sharm El-Sheikh)

Construction and paving of Sharm El Sheikh highway with a length of 30 km

Construction and paving of the future road between (Cairo-Ismailia - Cairo-Suez) road with a length of 9 km

Construction of the main intersection between (New giza - Ring Road)

Expansion and paving works of the main road (New Giza)

Road works pending the implementation of the expansion works of the Middle Ring Road in the distance from the intersection with the Cairo / Ismailia road to the intersection with the Cairo / Suez road

Development and paving of the airstrip at Wadi El-Natroun Airport

Construction and paving of the Bargan link road, the intersection of the Dabaa axis with Wadi Al-Natroun Al-Dabaa road, with a length of 10 km

Construction and paving of Cairo-Dabaa highway with a length of 15 km

Road works for the development of the strategic leadership entrance road from the Middle Ring Road with a length of (2.3) km (service road in the triangle of hope)

Road works Construction of (2) international schools in Al-Yasmin neighborhood Strategic leadership from a mark of 1 km

Road works for road development in the area
of the National Museum of Civilization and Ain Al-Sira

Construction and paving works of Ismailia / Suez Road (Abu Sultan Link) with a length of 10 km

Road works in the strategic leadership and the administrative capital

Road works for the road development
project surrounding Abu Rawash area

General site coordination works in the roads of the upscale neighborhood at the university in Area No. 6 in Galala

Construction and paving of a link (Ras Sidr) through the Sharm El-Sheikh tunnel

Construction, development and paving of 30 June
highway (Bahr Al-Baqar Sector) with a length of 10 km

Backfilling, construction and paving of a road
(Sokhna / Saffron) with a length of 30 km

Restaurant Saffron, Youssef Afifi Street, Touristic Villages, New Town, Hurghada, Red Sea, 54811, Egypt

Excavation works at the bus stop in the New Administrative Capital

Excavation and backfilling works Sub-road (01)
on the internal roads of the city of Galala

Construction and paving of Wadi Al-Malak Road (Al-Tal Al-Kabir) with a length of 10 km

Expansion and paving works of Salah Salem Road

Excavation and construction works in the monument and
People's Square in the New Administrative Capital

Road works pending the establishment of the new headquarters of
the General Command of the Armed Forces (Strategic Command)
Security and Administrative Area Portal)

Road works for the development of Cairo-Ismailia-Desert Road,
Phase II, with a length of 10 km

Road works for the development of Cairo-Ismailia-Desert Road,
the first phase, with a length of 25 km

Development and expansion of the
26th of July axis highway with a length of 10 km

Construction, development and paving of the
30 June Road (Geneva Sector) with a length of 10 km

Construction and upgrading of the Ismailia
Port Said highway with a length of 15 km

Construction and paving of the regional
ring road (Al-Wahat) with a length of 18 km

Construction and paving of the regional
ring road (Suez - Sokhna) with a length of 12 km

Construction and paving of internal roads in Madinaty

Excavation of a water line to feed 6th of October City with a length of 20 km

Backfilling of the earthen bridge and paving of the Field Marshal Bridge (NA)

Backfilling, construction and paving works of
Upper Egypt highway (Minya Link)

Backfilling, construction and paving of a highway (korimat / saffron)

Construction of the automatic control
station for Port Said electricity

Backfilling, construction and paving works of
Upper Egypt highway (Manfalut link)

Construction of Abu Khalifa drinking water
desalination plant 400 liters / second

Establishment of a sewage treatment plantfor the city of Al-Muneera for the benefit of
the Drinking Water Authority

highway construction works of the free
Upper Egypt project Beni Suef supply and
operation of 500 thousand square meters

highway construction works Free Upper Egypt
project, Minya sector Supply and operation of
one million square meters base layer

Development of Marsa Alam Airport by
increasing the length of the aircraft taxiway by 700 m

Construction of a new taxway with a length of 800 m

Making 2 dams on the course of the
Nile to establish the new barrages

Digging a canal to divert the course of the
Nile to establish the Naga Hammadi barrage

Removal of aircraft hangars and old warehouses
with the construction of a parking lot for the development
of Fayed Airport

Excavation of Ain Sokhna port and supply of
soil to replace the bottom of the container areas

Construction of new roads in the industrial
zone of Laurascom on an area of 7 million
square meters in the economic zone in Sokhna

Excavation works for Marriott Mirage Hotel
and the work of interlock parking lots

Works of entrances and exits of Alfardan
Bridge on the Suez Canal

Raising the efficiency of the June 30
Corridor road with a length of 15 km

Construction and paving of highways with a length
of 25 km for the international coastal road Sirte - Ras Lanuf

Works of foundation and asphalt layers for highway
works from the valley of Ferran Saint Catherine

Construction and paving of bridges Ismailia - Suez Road (almueahada)

Expansion and paving works at the
entrances to Cairo city from the Suez Road

Construction and paving works for the
implementation of transverse roads on the
axis of Dabaa (Jabal Hamed link) with a length of 5 km

Construction and paving works for the
implementation of transverse roads on the
Dabaa axis (Jabal Hamed link) with a length of 23 km

Road works pending the development and
raising the efficiency of roads and entrances
to the city of Matrouh (Matrouh-Siwa Road) with a length of 5 km

Road works in the Mahmoudia Hammam Canal

Construction and paving works of a permanent
diversion (Sokhna Road) with a length of 4 km

Constructing a culvert under the high-speed train (Marsa Matrouh)

Highway works for the implementation
of the extension of the Dabaa axis with
a length of (130) km implementation of 9 km

Backfilling, construction and paving
of the new um Zaghio in Alexandria
Governorate with a length of 5 km

Construction and paving of external roads
(high-speed train, Sokhna sector)

Constructing a culvert under the high-speed train (6th of October)

Construction and paving works for the international
coastal highway (service road)

Sewage treatment plant project in Luxor US aid / Orascom

Highway works for the development of Al-Khatatba Road
from the Cairo-Alexandria Desert Road with a length of 5 km

Duplication works and raising the efficiency
of Alfardan Salhiya Road with a length of 6 km